Price list
Service price list
Updated: 3 November 2026 · Introductory price valid until 31 March 2027.
The price list shows starting net prices for materials and services. You get a quote for your project when you import the BVN/BVX/BTL/BTLX file into the calculator.
When you place an order, you send us the project for technical and price review. That is not yet a confirmation. After the review you get a confirmation or a proposal for changes.
The published prices and calculator calculation are for projects with a normal range of machining suitable for our machines. For non-standard projects, we prepare an individual offer if necessary. We coordinate any changes to the price, scope of delivery or terms with you before confirming the order. The final price and scope of delivery are indicated in the offer to which the GORSKO order confirmation refers.
1. Price list
INTRODUCTORY PRICE UNTIL 31/03/2027
CNC-Abbund: €150/m³ net
Regular price: €180/m³ net.
| Item | Billing description |
|---|---|
| CNC-Abbund | Regular price €180/m³ net; introductory price €150/m³ net until 31 March 2027. |
| Planing special sections | €70/m³ net. |
| KVH | €550/m³ net. |
| BSH NSi – for concealed elements | €750/m³ net. For predominantly concealed structural elements. |
| BSH Si – for visible elements | €850/m³ net. For visible elements with higher surface-quality requirements. |
| Conventional CNC machining | Included in the CNC joinery price on the basis of a suitable BVN/BVX/BTL/BTLX file, with no per-operation surcharges within the usual scope.* |
| Production preparation | Included on submission of properly prepared BVN/BVX/BTL/BTLX file. |
| Packing organised for assembly | On. |
| More demanding and time-consuming processing | On request.* |
| Additional Materials | Current price in the calculator. |
| Organized transport | Price in calculator or offer. |
| Workshop design and preparation of BVN/BVX/BTL/BTLX machine files | On request. |
| Pre-assembly and installation of mechanical fittings | On request. |
| Structural calculations for the agreed scope of the structure | On request; the scope and responsible author are agreed before ordering. |
| Special solutions | On request. |
Billing basis: gross required material. Prices in €/m³ are based on the gross material required to manufacture the order, rather than the net volume of the finished elements. The gross quantity includes necessary machining allowances and production waste during preparation and machining. The chargeable gross quantity is stated in the calculation or quotation referenced in the order confirmation.
Applies to normal and more demanding CNC machining Clause 7 of the Notes and Conditions.
Notes and Conditions
- Offer valid for 14 days.
- All prices are in EUR, net and without VAT.
- Payment is made after confirmation of the order by GORSKO and before the start of execution. If the delivery period is 15 days or more, split payment can be agreed in the offer: the first part for the materials after order confirmation, the rest no later than two working days before shipment. The amount and term of both payments are specified in the specific offer.
- Transport includes delivery to the site provided it is readily accessible by a standard freight truck. Unloading is not included.
- Buyer shall provide adequate access, necessary permits, contact person and equipment and personnel for safe unloading. Waiting, re-delivery or special transport will be charged additionally if they are the result of inadequate access or the buyer's unwillingness.
- A 3% B2B credit is awarded on the net value of eligible products and services, excluding shipping, for each fully paid purchase. The credit is applied to a future purchase and is not redeemable in cash.
- Non-standard projects and more demanding processing: For projects with an extremely large number of demanding processing, time-consuming processing, material with a very small cross-section or other characteristics that make the project unsuitable for efficient processing on our machines, we reserve the right to refuse execution or prepare an individual offer before confirming the order. Such machining is not included in the standard CNC-Abbund price. We coordinate their scope and price with the customer before confirming the order.
2. Free
- Using bid calculator with BVN/BVX/BTL/BTLX import.
- Material and Dimension Check.
- Access to technical details library in PDF format.
3. Payment
Payment is possible by bank transfer in EUR (SEPA) or by Visa and Mastercard cards, without additional payment commission to the buyer.
Payment is made only after confirmation of the order by GORSKO, in accordance with the payment terms in the offer.
4. B2B partnership
For existing customers:
- 3% B2B credit on future orders subject to terms.
- Partner conditions based on annual order volume.
- Possibility of individual agreement on production capacities for regular partners.
Still have a question?
Find an answer about an order, project preparation, material or supply.